Image - Cacao Pod Vessel - K6706 © Justin Kerr FAMSI © 2003:
Douglas M. Weinberg, Elizabeth Graham, and David M. Pendergast
 

Salvage Excavation of the Alamilla/Gomez Property, San Pedro, Ambergris Caye, Belize

Appendix A.  Lot Index
Lot # Operation *  STP # Unit # Level Provenience Date
Opened
Date
Closed
101 1 001 N/A 1-3 STP 001, N 100 E 100 25/9/02 25/9/02
102 1 002 N/A 1-2 STP 002, N 100 E 105 25/9/02 25/9/02
103 1 003 N/A 1 STP 003, N 100 E 110 25/9/02 25/9/02
104 1 004 N/A 1-3 STP 004, N 105 E 100 25/9/02 25/9/02
105 1 005 N/A 1-2 STP 005, N 105 E 105 26/9/02 26/9/02
106 1 006 N/A 1-2 STP 006, N 105 E 110 26/9/02 26/9/02
107 1 007 N/A 1-3 STP 007, N 110 E 100 26/9/02 26/9/02
108 1 008 N/A 1-3 STP 008, N 110 E 105 26/9/02 26/9/02
109 1 009 N/A 1-2 STP 009, N 110 E 110 26/9/02 26/9/02
110 1 010 N/A 1-2 STP 010, N 115 E 100 26/9/02 26/9/02
111 1 011 N/A 1-2 STP 011, N 115 E 105 26/9/02 26/9/02
112 1 012 N/A 1-2 STP 012, N 115 E 110 26/9/02 26/9/02
113 1 013 N/A 1-2 STP 013, N 120 E 110 26/9/02 26/9/02
114 2 N/A 1 1a Test Unit 1, SW Corner at N100 E103, 0-20cm 27/9/02 27/9/02
115 2 N/A 1 1b Test Unit 1, SW Corner at N100 E103, 20-40cm 28/9/02 29/9/02
116 2 N/A 1 1c Test Unit 1, SW Corner at N100 E103, 40-60cm 29/9/02 29/9/02
117 2 N/A 1 1d Test Unit 1, SW Corner at N100 E103, 60-80cm 29/9/02 29/9/02
118 2 N/A 1 1e Test Unit 1, SW Corner at N100 E103, 80-100cm 30/9/02 31/9/02
119 2 N/A 1 B1 Test Unit 1, Burial 1 30/9/02 30/9/02
120 2 N/A 2 1a Test Unit 2, SW Corner at N110 E103, 0-20cm 30/9/02 30/9/02
121 2 N/A 2 1b Test Unit 2, SW Corner at N110 E103, 20-40cm 30/9/02 31/9/02
122 2 N/A 1 2a Test Unit 1, SW Corner at N100 E103, 100-120cm 31/9/02 31/9/02
123 2 N/A 2 1c Test Unit 2, SW Corner at N110 E103, 40-60cm 31/9/02 31/9/02
124 2 N/A 2 1d Test Unit 2, SW Corner at N110 E103, 60-80cm 2/10/02 2/10/02
125 2 N/A 2 2a Test Unit 2, SW Corner at N110 E103, 80-100cm 2/10/02 2/10/02
126 2 N/A 3 1a Test Unit 3, SW Corner at N116 E103, 0-20cm 2/10/02 2/10/02
127 2 N/A 3 1b Test Unit 3, SW Corner at N116 E103, 20-40cm 2/10/02 2/10/02
128 2 N/A 3 1c Test Unit 3, SW Corner at N116 E103, 40-60cm 3/10/02 3/10/02
129 2 N/A 3 1d Test Unit 3, SW Corner at N116 E103, 60-75cm 3/10/02 3/10/02
130 2 N/A 3 2a Test Unit 3, SW Corner at N116 E103, 75-95cm 3/10/02 3/10/02
131 2 N/A 3 F1 Test Unit 3, Feature 1 3/10/02 3/10/02
132 2 N/A 3 F2 Test Unit 3, Feature 2 3/10/02 3/10/02
Operations:
1–Shovel Testing
2–Test Units

Previous Page  |  Table of Contents  |  Next Page

Return to top of page